Permavoid
Smart with water

The goal is to slow down the flow of water into the sewer during periods of rainfall by detaining stormwater on-site.

Greenstreets

Greenstreets

Project information

Stormwater retention capacity: resulted in 97% reduced flowrate during peak rain events.

Location
London, UK
Year
2016
Project timeline
Water capacity
150000
Litres
Partner(s)
Polypipe
Solutions
Civils

Get inspired by these projects